Supportive Housing

Warren Residence

Client; Praxis Housing Initiatives

  • New (62) unit seven story ground up residential building
  • Job required rock removal and dewatering
  • Block and plank structure
  • Working farm on site as part of project
   

El Rio Residence

Client; Comunilife Inc.

  • New (65) unit six story ground up residential building
  • Block and Plank structure
  • Very complicated site and shape of building
  • Required rock removal, underpinning and dewatering
   

Ruby’s Place

Client; Community Counseling & Remediation

  • New (72) unit seven story ground up residential building
  • Block and plank structure
  • Built to property line on all sides
  • Stepped the foundations to avoid underpinning
   

Hour Apartment House III    

Client: Hour Children Inc.

  • New (28) unit four story ground up residential building
  • Job required rock removal and dewatering
  • Block and plank structure
  • Underpinning required on all sides
   

H.P.D

  • Tight property with a grade difference of 6ft from left to right
  • 14ft deep excavation in a small building site
  • 24 unit residence new construction
  • Curved wall, very difficult and time consuming
  • Building built up to property line on all sides requiring sheeting
  • Cavity wall construction 8” block and 4” brick with insulation
   

Harlem united

  • Ten Story Residences
  • 36 Units New Construction
  • Built Between 3 Existing Structure
  • Decorative Metal Mansard
  • Detailed Masonry
   

Convent House

  • Six Story Residence
  • 50 Units, New Construction
  • Built On Rock between Existing Structure     
  • Detailed Masonry Facade
 
 
Copyrights 2012 - All Rights Reserved
Site Designed and Maintained by Net Connections
 
HomeAbout UsWhy Us?TestimonialsContact UsGroup HomesCommericialNursing HomesEcclesiastical BuildingsSupportive Housing
Supportive Housing

Warren Residence

Client; Praxis Housing Initiatives

  • New (62) unit seven story ground up residential building
  • Job required rock removal and dewatering
  • Block and plank structure
  • Working farm on site as part of project
 

El Rio Residence

Client; Comunilife Inc.

  • New (65) unit six story ground up residential building
  • Block and Plank structure
  • Very complicated site and shape of building
  • Required rock removal, underpinning and dewatering
 

Ruby’s Place

Client; Community Counseling & Remediation

  • New (72) unit seven story ground up residential building
  • Block and plank structure
  • Built to property line on all sides
  • Stepped the foundations to avoid underpinning
 

Hour Apartment House III    

Client: Hour Children Inc.

  • New (28) unit four story ground up residential building
  • Job required rock removal and dewatering
  • Block and plank structure
  • Underpinning required on all sides
 

H.P.D

  • Tight property with a grade difference of 6ft from left to right
  • 14ft deep excavation in a small building site
  • 24 unit residence new construction
  • Curved wall, very difficult and time consuming
  • Building built up to property line on all sides requiring sheeting
  • Cavity wall construction 8” block and 4” brick with insulation
 

Harlem united

  • Ten Story Residences
  • 36 Units New Construction
  • Built Between 3 Existing Structure
  • Decorative Metal Mansard
  • Detailed Masonry
 

Convent House

  • Six Story Residence
  • 50 Units, New Construction
  • Built On Rock between Existing Structure     
  • Detailed Masonry Facade
 
Copyrights 2016 - All Rights Reserved